Polk 2 Combined Cycle Project


Mulberry, FL

This project for Tampa Electric Company is located at the Polk Power Station on Highway 37 just south of Mulberry, FL. BAUER Foundation Corp. (BFC) as the subcontractor to Zachry Industrial Inc., installed deep foundations consisting of 263 18" x 40' drilled displacement piles, 8 60" x 25' drilled shafts and 40 9.625" x 60' micro piles. BFC also installed four heat recovery steam generators, a cooling tower and associated buildings.